SweetDeals
Lifetime Impact 44 Inch Backboard Adjustable Portable Basketball System

Lifetime Impact 44 Inch Backboard Adjustable Portable Basketball System

Toyworld Australia · Toyworld

$299.99Available

Apple Pay, Google Pay, PayPal

Watch price

Selected variant · Available

Available. The price shown is for this option. We've recorded it as low as $299.99.

See it at Toyworld

In stock when we last checked on 14 Aug 2026. Prices change — confirm on the store's page before buying.

Price history

Every price we've recorded

We started tracking this on 12 Aug 2026 and have recorded a single price so far. The chart appears once we've seen the price move.

Description

As published by Toyworld

Please note that due to the size of this product, we are unable to offer shipping. However Click & Collect is available at selected stores.

Get the family to shoot some hoops and spend quality time together. Lifetime’s Streamline Portable Basketball Hoop is the ideal choice for any driveway or backyard. The portability lets you chose the perfect spot to play a game with your kids. The Impact® Backboard offers incredible durability with a shatterproof build and fade-resistant graphics. With the telescoping adjustment, you can easily change the height of the hoop to fit any skill level. The Lifetime Streamline Basketball Hoop offers a great way to bond with your kids while getting time outside.

FEATURE POINTS Telescoping Adjustment from 2.28 to 3.04 meters high (7.5 to 10 feet) All-Weather Net Impact® Backboard 111cm (44 inches) Streamline Rim with an all-weather nylon net and a 6.9cm (2.75 in.) diameter round steel pole Streamline 45L Portable Base Fade-Resistant Graphics

Details

As published by Toyworld
Weight
12000 kg

Variants

Prices and availability as last checked
OptionPriceStatus
Option 1$299.99Available
Store
Toyworld
Brand
Toyworld Australia
SKU
841101004555
Category
Team & Ball Sports
First tracked
12 Aug 2026
Last checked
14 Aug 2026

More Team & Ball Sports deals

Live deals in the same category, around the same price